Loads were gradually restored considering low voltages and high loading on 765 KV Agra-Gwalior lines. System load was restored to near normal level by 14.30 hours. All the transmission elements which tripped were restored by 16:00 hours.
Your email address will not be published. Required fields are marked *
Comment
Name *
Email *
Website
Save my name, email, and website in this browser for the next time I comment.